Show/Hide

P-CCS Students and Families: Below are important resources to stay posted with during this time. Please see the links below:

2020 bond a change you can see

2020 Bond Overview

Print
Press Enter to show all options, press Tab go to next option

 How was this plan developed?

Timeline Facility Boundry Study

  • P-CCS Administration engaged TMP Architecture and McCarthy & Smith to facilitate district-wide visioning sessions. The purpose was to develop potential programming and teaching needs throughout the District. The theme of the sessions was ‘Equity’ at all grade levels.
  • As a part of the visioning sessions, the district enlisted a group of Board of Education members, administration, staff, parents, students, and community stakeholders to discuss the imminent infrastructure and programmatic needs within P-CCS.
  • The visioning sessions were conducted February 2019 thru May 2019. Members from each school level met independently in order to discuss the needs at their facility.
  • Facility and Boundary Study 2019-2020 page contains links to the committee work and presentations
  • Following the visioning sessions, a public workshop session with the Board of Education was held to present the findings from the study and provide input and further direction.
  • In November, 2019, the Board voted to place the $275 million bond initiative on the ballot. The proposal would result in a ZERO INCREASE to the current tax rate of 4.02 mills.

Presentation to the P-CCS Board of Education in November 2019

""

 

 Frequently Asked Questions (PDF, 34 pages)